Skip to content
ETP & STP Daily Checklist, Bhiwadi

ETP / STP Operations

ETP & STP Daily Checklist, Bhiwadi

Daily, weekly, monthly and yearly checks that keep the outlet within your consent

Daksha Enterprises technical team

A treatment plant that runs well on paper and badly in the tank shows up in two places: the outlet sample and the Pollution Control Board inspection. This checklist covers what to check every shift, every week, every month and every year, so you catch the problem before either of them does.

How to use this checklist

The checks apply to both plant types. An ETP treats process effluent from your production line; an STP treats sewage from toilets, canteens and housing. The chemical stage matters more in an ETP and the biological stage carries most of the load in an STP, but the aeration, clarifier, sludge and record-keeping checks are the same.

Three rules make a checklist work instead of becoming a sheet someone ticks at the end of the shift:

  • Write the number, not a tick. "pH 7.2" tells you a trend next week. "✓" tells you nothing.
  • Give every line an owner. The operator does the shift checks, the in-charge reviews them daily, and the plant manager signs off weekly.
  • Your consent order sets the limits. The outlet limits, monitoring frequency and reporting conditions written in your Consent to Operate are what you are judged against. Use the figures below as typical operating ranges, and keep your own design and consent figures beside them.

Daily checks — every shift

Flow and levels

  • Note the inlet and outlet flow meter totaliser readings at the same time every shift. A gap between them that keeps growing means a leak, a bypass or a faulty meter, and all three are a problem at inspection.
  • Check the collection sump and equalisation tank levels. An equalisation tank running full has no buffer left for a production surge.
  • Confirm the equalisation tank mixer or aeration is running. Without it the tank turns septic and sends a shock load downstream.

Screening and oil removal

  • Clean the bar screen and remove the screenings into a covered bin.
  • Skim the oil and grease trap. Oil that reaches the aeration tank coats the biomass and causes foaming.

Chemical dosing

  • Check the level in each dosing tank — lime or caustic, alum or PAC, polyelectrolyte, hypochlorite — and refill before it runs dry, not after.
  • Check that each dosing pump is actually delivering. A pump can run with an air-locked or choked suction line and dose nothing.
  • Look at the flash mixer and flocculator: the floc should be visible and settle fast in a beaker. Fine, cloudy floc usually means the coagulant or polyelectrolyte dose needs adjusting.

Aeration tank

  • Measure dissolved oxygen (DO). Most plants run at around 2 mg/l; below 1 mg/l the biology slows down and the tank starts to smell.
  • Do the 30-minute settling test (SV30): fill a one-litre measuring cylinder from the aeration tank and read the settled sludge volume after 30 minutes. It is the cheapest and most useful test on the plant — record it every day and watch the trend.
  • Look at the colour and the foam. Healthy mixed liquor is chocolate brown with a little light foam. Black, grey or heavily foaming tanks are covered in the troubleshooting section below.
  • Check pH in the aeration tank. Biology is most comfortable between 6.5 and 8.5.
  • Check every blower: running hours, current reading, noise, belt condition, and that the duty and standby units are swapped on schedule.

Clarifier

  • The overflow should be clear, with no floc going over the weir.
  • Check that the return sludge (RAS) pump is running and the sludge is reaching the aeration tank.
  • Look for sludge clumps floating on the surface — a sign that sludge is sitting too long in the clarifier.

Filters and disinfection

  • Read the pressure gauges on the pressure sand filter and activated carbon filter. When the pressure drop across a filter rises past its set point, backwash it.
  • Check the residual chlorine at the outlet against the target set for your plant.

Sludge

  • Record how many filter press batches or how much sludge went to the drying beds.
  • Check that the sludge storage area is covered and the sludge is not washing out into the drain.

Logbook

  • Fill the logbook during the shift, not from memory at the end. The in-charge signs it every day.

A practical daily log sheet has these columns: date and shift, inlet and outlet flow meter readings, pH at inlet, after neutralisation, aeration tank and outlet, DO, SV30, outlet appearance, residual chlorine, chemicals dosed (kg or litres), blower and pump hours, sludge removed, remarks, and operator and in-charge signatures.

Weekly checks

  • Lab tests on the plant. COD and TSS of the inlet and outlet, and MLSS of the aeration tank. If you do not have an in-house lab, a weekly sample to an outside lab is still worth the cost.
  • Sludge volume index (SVI). Divide the SV30 reading (ml/l) by MLSS (g/l). Between about 80 and 150 the sludge settles well. Above 150 it is starting to bulk.
  • MLSS against your design figure. Extended aeration plants commonly run at 2,500–4,000 mg/l. Waste sludge when MLSS climbs above your design range, and hold back wasting when it falls.
  • Jar test whenever the inlet changes — a new product line, a different raw material, a cleaning campaign — to set the right coagulant and polyelectrolyte dose.
  • Diffuser check. Uneven bubbling, or one corner of the tank that boils while another is dead, means choked or broken diffusers.
  • Standby equipment. Run every standby pump and blower so you know it starts.
  • Calibrate the pH meter with buffer solutions, and clean the probe.
  • Clean weirs, channels and launders before algae build up.
  • Check chemical stock against consumption. Order with enough lead time that you never run out — two to four weeks of stock is a sensible buffer.

Monthly checks

  • Outlet analysis by an outside lab for the parameters in your consent, at the frequency your consent sets. Keep every report — the inspector will ask for them.
  • Trend review. Plot the month's outlet pH, COD, TSS, MLSS and SV30. A slow drift is easier to fix than a sudden failure.
  • Cost per kilolitre. Divide the month's chemical and power cost by the volume treated. A sudden rise usually points to overdosing, a failing blower or a change in the inlet.
  • Calibrate the DO meter and verify the flow meters.
  • Sludge disposal records. Match the sludge generated with the sludge sent out, and file the transport documents.
  • Structural walk-round. Look for leaking tanks, corroded walkways and railings, damaged covers and broken lighting.
  • Nutrient check for industrial ETPs. Biology needs nitrogen and phosphorus in a ratio of roughly BOD:N:P = 100:5:1. Many process effluents are short of both, which shows up as poor settling and weak treatment. It is corrected with a measured dose of urea and DAP.

Yearly checks and compliance dates

  • Consent to Operate (CTO) renewal. Note the expiry date and start the renewal at least three months ahead. Operating on an expired consent is a violation in itself.
  • Hazardous waste authorisation. ETP sludge is usually classed as hazardous waste. Check that your authorisation is valid and the sludge is going to an authorised facility.
  • Hazardous waste annual return (Form 4 under the Hazardous and Other Wastes Rules, 2016) — due by 30 June for the previous financial year.
  • Environmental Statement (Form V under the Environment (Protection) Rules, 1986) — due by 30 September for the previous financial year.
  • Desludge the tanks that collect grit and settled solids, and inspect what the sludge has been hiding.
  • Overhaul the blowers and replace damaged diffusers.
  • Capacity review. Compare this year's flow with the plant's design flow. Production that has grown 30 percent on a plant that has not is the most common reason a good plant starts failing.
Your consent order may add conditions beyond these — continuous monitoring, quarterly returns or reuse targets. Read it once a year with the checklist beside you.

Inspection-readiness checklist

When a Pollution Control Board officer visits, these are the things that are checked. Walk through the list yourself once a month.

  1. A valid Consent to Operate, with its conditions available to show.
  2. The plant running at the time of the visit, with operators on site.
  3. Working flow meters at inlet and outlet whose readings match the logbook.
  4. A separate energy meter for the treatment plant, where your consent requires one. Power consumption that does not match the volume treated raises the question of whether the plant actually ran.
  5. No bypass line, no flexible pipe and no discharge point that is not shown on your approved plan.
  6. A logbook filled in daily, outside lab reports, and chemical purchase bills that support the dosing you have recorded.
  7. Sludge stored on an impervious floor under cover, labelled, with disposal documents on file.
  8. Treated water reuse records — gardening, flushing, cooling tower make-up — if your consent requires reuse.
  9. Stormwater drains kept separate from the effluent line.

Troubleshooting from the aeration tank

Most problems show up in the aeration tank or the clarifier before they show up in the lab report. Use these as a first check:

  • Thick white foam — young or thin biomass, common after start-up or a toxic shock. Check MLSS, reduce sludge wasting and check the inlet for a toxic discharge.
  • Thick dark brown scum — old sludge or filamentous growth, often with grease. Increase sludge wasting and check the oil trap.
  • Black mixed liquor and a rotten-egg smell — the tank is short of oxygen. Check the blower, the air line and the diffusers.
  • Sludge that will not settle (bulking) — high SVI. The usual causes are low DO, a nutrient shortage or a very light organic load. Check all three before dosing anything.
  • Sludge clumps rising in the clarifier — sludge sitting too long in the clarifier. Increase the return sludge rate.
  • Cloudy clarifier overflow with fine floc — an over-aged sludge or a toxic load. Review sludge wasting and the inlet.
  • Falling pH in the aeration tank — nitrification is using up alkalinity, or the inlet has turned acidic. Check the neutralisation stage.
  • Outlet COD high while the biology looks healthy — part of the load is not biodegradable. Look at what has changed on the production side, and run a jar test on the chemical stage.

Safety checks that get skipped

  • Gas in sumps and closed tanks. Hydrogen sulphide builds up in collection sumps, equalisation tanks and sludge pits. Nobody enters without a gas test, a confined-space permit and a second person outside.
  • Chlorine and hypochlorite storage — in the shade, ventilated, away from acids.
  • PPE at the dosing area — goggles, gloves and an apron for lime, caustic and acid, and a working eyewash or water point nearby.
  • Railings, covers and lighting on every tank walkway, especially for night shifts.
  • Blower room ventilation and guards on belts and couplings.

Notes for Bhiwadi, Neemrana and nearby belts

  • Which board you report to. Units in Bhiwadi, Chopanki, Khushkhera, Tapukara, Karoli, Neemrana and Ghiloth hold their consent from the Rajasthan State Pollution Control Board. Units in Bawal, Dharuhera, Manesar, Gurugram, Bilaspur and Kharkhoda report to the Haryana State Pollution Control Board. The checklist is the same; the portals, forms and inspection teams differ.
  • Units connected to a CETP. If your effluent goes to a common effluent treatment plant, your limits are the CETP's inlet standards rather than final discharge standards. Your pre-treatment and records still have to stand up on their own.
  • Summer. Water holds less oxygen as it gets hotter, so DO drops in May and June with the same blowers running. Check DO more often and make sure the standby blower works before the heat arrives.
  • Monsoon. Rainwater entering the effluent line dilutes the plant and can wash biomass out of the clarifier. Keep stormwater drains separate and the tank covers in place.
  • Diwali and other shutdowns. With no inlet for a week, the biomass starves. Reduce aeration rather than switching it off, keep some feed going if you can, and expect the plant to need a few days to settle after restart. Bioculture helps it recover faster.
  • Winter nights. Low temperatures slow the biology, nitrification most of all. Allow for slower treatment and avoid sudden load increases.

Chemicals to keep in stock

Running out of a dosing chemical is the most avoidable reason an outlet fails. A typical ETP or STP stock list:

  • pH correction: lime powder, caustic soda flakes and sulphuric acid.
  • Coagulation: alum or poly aluminium chloride (PAC), and ferrous sulphate where it suits the effluent.
  • Flocculation: cationic and anionic polyelectrolyte, chosen by jar test.
  • Biology: urea and DAP for nutrients, and bioculture for start-up and recovery after a shock or shutdown.
  • Disinfection: sodium hypochlorite or bleaching powder.
  • Problem-solvers: defoamer, odour control compound and activated carbon.

We supply these from Bhiwadi to plants across the Rajasthan and Haryana industrial belts. See the full ETP and STP chemicals range, or if you are planning a new plant or an upgrade, our ETP and STP plant setup service. Send us your enquiry with your plant capacity and monthly consumption for a quote.

Enquiries

Tell us what your water is doing

Send the product name, the volume, or just the problem you are seeing in the loop. We will come back with a specification and a price.